Golik, O. V. 2016. “STATISTICAL PROCEDURES FOR TWO-SIDED LIMIT OF A CONTROLLED PARAMETER IN THE PROCESS OF PRODUCTION OF CABLE AND WIRE PRODUCTS”. Electrical Engineering & Electromechanics, no. 5 (October):47-50. https://doi.org/10.20998/2074-272X.2016.5.07.